Construction of a new concrete road in Revierre has started. The 618 feet road is being done at an estimated cost of $408-thousand EC dollars.
In addition to the road, there will also be the construction of seven (7) retaining walls, and over 900 feet of drains.
The work is being carried out by BRAGSA and is scheduled to be completed in six (6) weeks.