The Roads, Buildings and General Services Authority (BRAGSA) has completed the construction of a new concrete road in Villa Flat, East St. George.
The first phase of the project saw the construction of 550 feet of road, along with 26 feet of Slipper and Swale drains.
In addition, repairs were done on 135 feet of an existing Box drain.
The second phase which started earlier this week, will see the construction of 200 feet of concrete road, along with Slipper, Swale and Box drains.
The project is scheduled to be completed next month.